Sunday, May 15, 2011

Inside Almost complete!!

So, there hasn't been many pictures as we are nearing the end of the long awaited journey of moving into the house.  We received our official expected close date of June 3, 2011 on Thursday of last week.  What is left: appliances in kitchen/laundry room, ceiling fans, shower door in master bath, carpet, blinds on the windows, airconditioner, and sod outside

 Here is the banister completed...did not know it was going to stained.  I thought it looked funny at first, but is growing on me :)
 
 Here is a close up of the back splash and you can kind of see the counter
 Kitchen with the counter tops and back splash.  The guys were there painting when we came so their stuff was everywhere


Counter close up next to backsplash

Cute sink in powder room
Guest bathroom complete
 Bathtub in master bathroom
One of the sinks in the master bathroom

Saturday, April 30, 2011

Phase 4-Cabinetry

Went and saw the house today.  So excited it looks pretty awesome!! 

 Here is the breakfast area with part of the kitchen.  Notice the stupid open cabinets under the island there.  Not sure what they are there for, but not happy about it.

 Kitchen -Full View
 Living room view from the stairs

 Dining room
Guest Bathroom

Monday, April 25, 2011

Phase 3 complete

Okay so I know it has been almost two weeks since I posted, but I didn't think that walls were cool and that people would want to see them.  I have been sharing this blog with my students and just about everyday they ask me so do you have more pictures.  I know some of you are like...Phase 3???  How many dang phases are there.  I don't know yet, but I figured the finishing of the walls and the beginning of interior stuff should be different phases.  I'm going to guess about 5 phases total...maybe 6.  The builder actually says there are 10 phases so I guess I doing good!!

 The kitchen with the window fully cut out (previous blog had it partially covered by drywall)
 Stairway with the banister added
 breakfast area with paint
 front with driveway
 me standing in master bathroom.  We were pleasantly surprised with the double doors that we didn't know we were getting
Another view of kitchen (there is no paint in this one lol obviously)

Sunday, April 10, 2011

Phase 2 just about complete, Phase three beginning

So It's been a few days since I posted.  While I have been slacking, the crew has not.  On Thursday we had our pre-dry wall inspection.  I don't have many pictures of the dry wall right now because it was super messy when we went into the house.  


 House is complete on the outside.  Small pieces of brick area missing due to damaged window...needs to be replaced first.
 Kitchen with dry wall
 Foam insulation! 
 Back porch complete
Side of house (master bedroom side)

Saturday, April 2, 2011

This building now looks like a house--Phase 2 almost complete

FINALLY, this house is looking like a house instead of a bunch of wood and cement.  We have our final inspection before drywall next Thursday!!

 DOORS AND WINDOWS AND ROOF!!
 Back of house
 From left to right: living room-masterbedroom
 Another view of side
 My huge kitchen-looks bigger now with walls :)
 The staircase
 Entrance to master bathroom
windows in master bedroom

Saturday, March 26, 2011

Phase 2 underway! 2nd Story framed up

Went by the house today (Haha feel like I'm getting redundant saying that).  I was actually able to walk through the house up on the 2nd floor too.   Starting to feel like the house now.  Still feels small, but started to feel more like it did when I walked through before.

 House with the 2nd story framed up
 Back of the house with covered porch
Back Porch
 One of the bedrooms upstairs
 Kitchen with the beginning of the island
Me on the stairs


Wednesday, March 23, 2011

Phase 2 has Started!! First Floor Framed!

Okay so we went by the house tonight and the first story is almost framed up.   Appeared like they were beginning to work on the 2nd story too.  Should see roof soon!!

 Kitchen!!
 Master Bedroom
 Garage :)
 Back Porch

Saturday, March 19, 2011

Phase 1 Complete: Foundation is done!!

The foundation is complete and formwork removed!  They will start framing on Tuesday March 22.  It is coming along nicely.  Today when we were there we look at the plans and tried to visualize where everything was.  It feels so much smaller than it really is (I have been inside the same plan already before we built it).  Can't wait!  Starting to get really excited. 
 Jason standing on the porch :)
 Backyard...looks bigger now than we originally thought
 Master bathroom/Garage area
 Me standing in the garage
 back porch at least part of it
Full view of foundation from the back yard

Thursday, March 17, 2011

Framework Complete

 Okay so this is the last time you will see the framework pictures!!  Tomorrow they are pouring the cement for the foundation!!!!  Pictures to come on Saturday.  Process is moving right along nicely.  No rain the forecast until Tuesday.  I'm following a house down the way nearby which is about 2 weeks behind ours and they already have the house pretty much dried in (windows up and everything).



If you look closely you can see the small back yard patio




 Yay for floor outlet!
 Front view of the framework
 From the street--Excited, this was 7pm and little sun on the house at all!!
Close up of the porch